The short answer
- Most of your quoted lead time is supplier transit and approval, not production
- Measure actual delivery times rather than trusting published ones
- Know each supplier's same-day cut-off in your own time zone
- Lead times stretch in season — plan for it rather than discovering it
- Publish a real lead time; an optimistic one turns every order into a rush
A decorator's delivery date is largely made of other people's time. The press work is often the shortest part, and a lead time built only from production will be wrong every time something upstream takes as long as it actually takes.
Whose time is it
| Stage | Whose | Typical share |
|---|---|---|
| Quote and order | Customer's | Variable |
| Artwork and approval | Mostly customer's | Often the largest |
| Blanks ordered and delivered | Supplier's | 3–5 days |
| Screens and scheduling | Yours | 1 day |
| Production | Yours | 1–2 days |
| Delivery | Carrier's | 1–2 days |
Production is frequently the smallest block. That is why a shop that has invested in press capacity and still misses dates is usually losing time to approvals and deliveries, not to printing — which is the same finding as the daily "waiting on someone else" list.
You cannot buy your way out of a lead time that is mostly other people's.
Finding the real numbers
Published lead times are targets. Measured ones are facts, and only one of them belongs in a promise.
Measure for a quarter
- Order placed to goods received, per supplier
- Whether the order arrived complete or split
- Proof sent to approval received, per customer type
- Approval to production start
- Dispatch to delivery, per carrier
Use the median rather than the average, and note the worst case separately. An average pulled down by a run of fast deliveries hides the one that will catch you, and it is the worst case that determines how much slack a promise needs.
Record complete-versus-split separately. A supplier who usually arrives in three days but splits a third of orders has an effective lead time closer to the second shipment, and that is what your schedule actually depends on.
Building a lead time
Add the measured stages, then add slack — not because you are slow, but because something is late roughly every fifth job.
| Stage | Working days |
|---|---|
| Approval (assume it takes what it takes) | 2 |
| Blanks ordered and received | 3–5 |
| Screens and scheduling | 1 |
| Production | 1–2 |
| Sorting and packing | 1 |
| Delivery | 1–2 |
| Slack | 1–2 |
That is a realistic ten to fifteen working days for an ordinary order, and it is longer than most shops quote. Quoting shorter does not make it happen faster; it converts normal jobs into rushes you cannot charge for.
Attach the approval deadline to the quote. "Approve by Tuesday and we hold the 14th" moves the variable stage into the customer's control and makes the date conditional on something they can do — which is the single most effective change to lead time reliability.
Cut-offs
Every supplier has a same-day order cut-off, and missing one by ten minutes costs a full day. Those times should be recorded and visible, not held in somebody's memory.
Record per supplier
- Same-day cut-off, converted to your time zone
- Which warehouse serves you
- Typical transit days from that warehouse
- Whether they ship complete by default
- Weekend and holiday behaviour
Time zone conversion is where mistakes happen. A cut-off quoted in the supplier's local time is not the time on your clock, and an order placed at what you thought was the deadline can miss it by hours.
Put the list where whoever places orders can see it at four in the afternoon, which is exactly when nobody wants to go looking — the same reasoning as the rest of managing several suppliers.
Seasonal variation
Lead times stretch when everybody is busy, and the periods are predictable.
| Period | Effect |
|---|---|
| Back to school | Blanks stock thins; deliveries slow |
| Pre-holiday | Carrier congestion, longer transit |
| Sports season starts | Popular styles short |
| Manufacturing holidays | Overseas restock pauses |
| Your own peak | Your production time lengthens too |
Extend your published lead time in those windows rather than absorbing the difference. A shop quoting the same ten days in its busiest month as in its quietest is promising something it cannot deliver, and doing so at exactly the point when failing is most visible.
Build that into the seasonal plan: approach customers earlier, close stores earlier, and order blanks earlier for anything landing in a peak.
Publishing it
State a real standard lead time where customers see it before ordering. That does three things at once.
It sets the expectation, so an ordinary order is not experienced as slow. It gives you a baseline to define a rush against, which is what makes a rush charge defensible. And it filters enquiries — a customer who needs it in three days finds out immediately rather than after a quote.
Then hold to it. A published lead time you routinely beat teaches customers the real number is shorter, and within a few months you will be quoting against your own best case rather than your stated one. The rest of the suppliers archive assumes your dates are built from measurements.
When you cannot meet a date
Sometimes the arithmetic says no. What matters then is that the customer hears it from you early, with options, rather than discovering it late.
What to offer instead
- The earliest date you can genuinely hold
- A simpler version — fewer colours, one location — that fits
- A partial delivery by the original date, the rest to follow
- A different garment that is in stock now
- A different process with a shorter path
The partial option solves more problems than it gets credit for. A customer needing shirts for an event usually needs them for the people attending, not the full quantity — and forty by Friday with the balance the following week frequently answers the real requirement.
Say it as soon as the arithmetic is clear. A date declined on day one keeps the relationship; the same date accepted and missed does not, and it is the same discipline as turning down an order.