PricingPublished

Pricing rush jobs so they are worth taking

A rush charge is not a penalty, it is the cost of disruption. What a rush actually costs you, and how to price it without losing the customer.

  • 11 min read
  • 1,105 words
Pricing rush jobs so they are worth taking — pricing calc at a print shop
Pricing11 min readA1printsoft EditorialPhoto: Towfiqu barbhuiya / Unsplash
On this page6 sections

The short answer

  • A rush costs you displaced work, expedited freight and overtime — not just urgency
  • Define it against your standard lead time, and publish both
  • Tiered charges by how far inside the standard lead time it falls
  • Say the price and the date together, so it is a choice rather than a plea
  • Most repeat rushes are a customer planning problem you can fix

Rush jobs are treated as a favour in most shops, and priced as one. The customer is grateful, the shop absorbs a disrupted week, and the same customer comes back with the same request because it worked last time.

A rush charge is not a penalty for being late. It is the price of the disruption, and once you can name what that disruption costs, charging for it stops feeling awkward.

What does a rush actually cost you?

CostWhere it lands
Displaced workOther jobs pushed; their dates at risk
Expedited freightBlanks shipped faster, often much dearer
OvertimeReal wage cost, or goodwill spent
Extra setupA part-run inserted between other jobs
Error riskRushed work has a higher reprint rate
AttentionSomebody watches it all the way through

The first row is the largest and the least visible. Inserting a rush into a full week does not add work — it moves other jobs, and those belong to customers who were given dates. One accepted rush can put three deliveries at risk, which is a far bigger exposure than the margin on the rush itself.

Expedited freight is the one you can put a number on immediately, and it is exactly the sort of charge that never appears on a price list. If blanks have to arrive next day rather than in three, that difference is a real invoice and it should appear on the quote rather than being absorbed.

A rush is not one job moving forward. It is three other jobs moving back.

Defining a rush

You cannot charge for a rush without a standard to measure it against. Publish your normal lead time, honestly, and define rush as anything inside it.

TimingTreat as
At or beyond standard lead timeNormal pricing
Inside standard, comfortably achievableTier 1 rush
Requires reordering the scheduleTier 2 rush
Requires overtime or expedited freightTier 3 rush
Only possible if nothing goes wrongDecline, or quote a simpler version

Be honest about the standard lead time. A shop quoting ten days that routinely delivers in six has defined most of its work as a rush and cannot charge for any of it, because customers have learned the real number.

Build the standard from actual production steps rather than from optimism — supplier transit, screens, press, cure, sorting, delivery. That is the same arithmetic as working backwards from a delivery date, and it is the only defensible basis for saying something is inside it.

How much to charge

Enough to cover the disruption, structured so the customer can see what they are buying. Tiers work better than a single figure because they let the customer choose their own urgency.

What each tier should recover

  • Tier 1 — the attention cost. Modest, and often the one customers accept without comment
  • Tier 2 — attention plus the cost of rescheduling other work
  • Tier 3 — all of that, plus actual expedited freight and overtime, itemised

Pass expedited freight through at cost and show it as its own line. It is verifiable, it is obviously not margin, and it makes the rest of the charge easier to accept because the customer can see you are not simply marking things up.

Set a floor. A percentage uplift on a small order recovers very little, and small orders are exactly the ones that disrupt a schedule for the least return. A minimum rush charge — a fixed amount regardless of order size — is the honest structure.

Saying it

Price and date together, as a choice. A rush conversation goes wrong when it becomes a negotiation about whether you can rather than what it costs.

Three that work

  • "Standard is the 22nd at $X. I can do the 16th at $Y — that covers the express freight on the blanks and moving two jobs. Which would you like?"
  • "I can hit the 16th if we drop to one colour. Two colours needs the 19th. Both work — your call."
  • "I can't do the 14th and be confident. I can promise the 18th, or I can do 24 of them by the 14th and the rest by the 18th."

The third is the most useful and the least used. A partial delivery by the original date often solves the customer's real problem — they need shirts for the people at the event, not all two hundred — and it costs you far less than compressing the whole run.

When to decline

When it only works if nothing goes wrong. A job with no slack for a late delivery, an artwork problem or a misprint will occasionally fail, and it will fail publicly at something you agreed to.

Decline warmly and offer the nearest thing you can do. That is the same discipline as any order you turn down: a fast no with an alternative keeps the relationship, and a reluctant yes that misses the date does not.

Also decline when the rush would break a promise already made. Your existing customers were given dates in good faith, and moving them to accommodate a new order is borrowing from people who have not agreed to lend.

Reducing how often it happens

Most repeat rushes are predictable. The same club, the same tournament, the same month — the customer is not disorganised so much as unprompted.

What removes the recurring ones

  • Prompt seasonal customers six to eight weeks before last year's date
  • Publish real lead times where customers see them before ordering
  • State the approval deadline on every proof, with the consequence
  • Give store organisers a close date built backwards from delivery
  • Tell a customer at the quote what date they need to decide by

The proof deadline is the highest-value item. A large share of rushes are self-inflicted: the order arrived in good time and sat waiting for approval, and by the time it came back the comfortable schedule had gone. Attaching a consequence to the approval date — approve by Tuesday and we hold the 14th — converts a request into a decision and removes the most common cause of a rush that was nobody's fault. The rest of the pricing archive assumes your standard lead time is real.

Filed underPricing
Share
Written byA1printsoft Editorial
175 articles

The print production desk at A1Printsoft. Writes the practical side of running a decorating shop: what things cost, how long they take and what to charge, checked against published trade figures.

Keep reading

More on pricing

All Pricing articles

Set up in an afternoon. From what you already do.

Free for 14 days · no card · pick what you make and we preload the methods, products and price tables.